LCSE Cisco Lifecycle Services Express : 650-393 Exam
Exam Number/Code: 650-393
Exam Name: LCSE Cisco Lifecycle Services Express
“LCSE Cisco Lifecycle Services Express”, also known as 650-393 exam, is a Cisco certification.
Preparing for the 650-393 exam? Searching 650-393 Test Questions, 650-393 Practice Exam, 650-393 Dumps?
To become certified of LCSE expert in LCSE Cisco Lifecycle Services Express, the candidate must pass the qualification 650-393 exam. With the complete collection of questions and answers, Pass4sure has assembled to take you through all the needed subjects to your 650-393 exam preparation. The exam is web-based, i.e the candidate can apply online test and finish it from the PC(connected to internet), it adds the variable that the users answer the questions at will. We DO NOT supply pass guarantee for this exam, but we are constantly free updating our LCSE Exam as far as you passed it.
Notice: No pass guarantee and No refund for this item, purchase it prudently!
We DO NOT supply pass guarantee for LCSE exam, but we are constantly free updating our LCSE exam as far as you passed it.No refund for this item, purchase it prudently!
This product consists of one set of real Q&As, one set of study guide and two sets of practice exams. We don’t promise all the answers are correct in the real Q&As, but you can correct them by referring to the answers from the two practice exams!
If you have any different ideas about the answers for the 37 Questions, please do contact us by support@pass4sure.com
Questons and Answers : 37 Q&As
Updated: 2/21/2008
PLS wait
04.18 2008 update
http://rapidshare.com/files/95250677/Cisco…0_393_-_ENU.rar
http://ifolder.ru/5514037
It’s my opinion
1 c
2 c
4 a
5 b
6 b
8 c
9 d
10 c
11 bde
12 d
14 a
15 a
16 d
17 b
18 c
19 abe
20 ace
21 b
22 (ab)?
23 d
24 bce
25 a
26 b
27 b
28 c
29 bd
30 e
31 a
32 c
33 acd
34 d
35 b
36 acd
37 b
38 c
39 b
40 a
I took the test.
My score is 920, screenshot below
There you go (I just finished):
1. c
2. c
3. ?
4. a
5. b
6. c
7. ?
8. c
9. d
10. c
11. b, d, e
12. d
13. ?
14. a
15. a
16. d
17. b
18. d
19. a, b, e
20. a, c, e
21. d
22. a
23. d
24. b, e, f
25. a
26. b
27. b
28. c
29. b, d
30. e
31. a
32. c
33. a, c, d
34. d
35. b
36. a, c, d
37. b
38. c
39. b
40. a
Good luck fido and samsung, hope this gonna help.
If I was you, I would print the pdf file, and put a mark on the correct answer and use this marked-printed sheet during the exam, but hey, each one’s got his own method.
Please come back with your results and scores and missing questions.
someone pls post answer
Question #1
Which definition best describes the staff training service component within the implement phase? Select exactly 1 answer(s) from the following:
A. improving the network management system and the performance and functionality of infrastructure operations
B. providing a step-by-step plan that details the installation and service-commission tasks required in order to create a controlled-implementation environment that emulates a customer network
C. developing and implementing a training plan using classes, workshops, or c-learning courses
D. compiling a training manual for use in ongoing operations
E. reducing the risk of downtime due to facilities-related problems
Answer : A (Reference : [websitebanned], examworx)
Question #2
In which of these phases are a customers technology strategy requirements identified and documented? Select exactly 1 answer(s) from the following:
A. Plan
B. design
C. prepare
D. operate
Answer : C (Reference : pass4sure, [websitebanned])
Question #3
What is the key objective of the plan phase? Select exactly 1 answer(s) from the following:
A. identify the activities involved in installing and configuring equipment at a customer’s site or sites.
B. Describe the day-to-day activities required to support, manage, and monitor a newly implemented system.
C. Assess current network readiness, site readiness, and operational readiness in preparation for designing a solution proposal.
D. Gain an understanding of high-level business and technical requirement.
Answer : A (Reference : [websitebanned], examworx)
Question #4
In which of these phases is a customers network assessed to determine its system readiness? Select exactly 1 answer(s) from the following:
A. plan
B. design
C. operate
D. implement
Answer : A (Reference : [websitebanned], examworx)
Question #5
In the design phase, which service component provides the customer with a comprehensive design? Select exactly 1 answer(s) from the following:
A. Implementation Plan
B. Detailed Design Development
C. Project Kick-off
D. Staging Plan
E. High-Level Design
Answer : B (Reference : pass4sure, [websitebanned], examworx)
Question #6
Which best describes the customer benefit of developing business requirements in the prepare phase?
A. reduce unnecessary disruption, delays, rework, and other problems by establishing test cases for use in verifying that the system meets operational, functional, and interface requirements
B. improve its ability to make sound financial decisions by developing a business case based on its business requirements and establishing a basis for developing a technology strategy
C. reduce operating costs and limit change-related incidents by providing a consistent and efficient set of processes
D. improve the return on investment and hasten migration by identifying and planning for necessary infrastructure changes and resource additions, as well as reduce deployment costs by analyzing gaps early in the planning process to determine what is needed to support the system
Answer : D (Reference : [websitebanned], examworx)
Question #7
In Which of these phases are a customer’s business requirements identified and documented?
A. plan
B. design
C. prepare
D. operate
Answer : C (Reference : [websitebanned], examworx)
Question #8
What is one key objective of the operations readiness assessment performed in the plan phase? Select exactly 1 answer(s) from the following:
E. align business requirements with technical requirements
F. create a plan to recycle used equipment
G. evaluate the readiness of a customers current operations and network management infrastructure to support a new technology
H. install and test system components in a non-production environment
Answer : C (Reference : pass4sure, [websitebanned])
Question #9
Conducting a project kick-off in the plan phase provides which of the following customer benefits? Select exactly 1 answer(s) from the following:
A. ensure that it receives detailed network diagrams
B. reduce the risk of downtime due to facilities-related problems
C. ensure end-user support immediately after the launch of a new system
D. confirm project roles and responsibilities, as well as milestone dates
Answer : D (Reference : Actualests, [websitebanned], examworx)
Question #10
Which prepare phase service component involves providing a customer with a financial justification for adopting a technology? Select exactly 1 answer(s) from the following:
A. Technology Strategy Development
B. High-Level Design Development
C. Business Case Development
D. Proof of Concept
Answer : C (Reference : [websitebanned], examworx)
Question #11
Which three of these service components are in the design phase? (Choose three.)
Select exactly 3 answer(s) from the following:
A. Account Qualification and Planning
B. Detailed Design Development
C. Staff Training
D. Systems Acceptance Test Plan Development
E. Staging Plan Development
F. Site Readiness Assessment
Answer : B, C, E (Reference : [websitebanned], examworx)
Question #12
Which of the following best describe the customer benefit of assessing for network readiness in the plan phase? Select exactly 1 answer(s) from the following:
A. reduce unnecessary disruption, delays, rework, and other problems by establishing test cases for use in verifying that the system meets operational, functional, and interface requirements
B. improve its ability to make sound financial decisions by developing a business case based on its business requirements and establishing a basis for developing a technology strategy
C. reduce operating costs and limit change-related incidents by providing a consistent and efficient set of processes
D. improve the return on investment and hasten migration by identifying and planning for necessary infrastructure changes and resource additions, as well as reduce deployment costs by analyzing gaps early in the planning process to determine what is needed to support the system
Answer : D (Reference : [websitebanned], examworx)
Question #13
Which of these phase comprises post-project support activities: activities that happen after a project is successfully implemented and handed off? Select exactly 1 answer(s) from the following:
A. plan
B. prepare
C. operate
D. implement
Answer : A (Reference : [websitebanned], examworx)
Question #14
Which prepare phase service component involves recommending an appropriate technology that will address a customers business requirements? Select exactly 1 answer(s) from the following:
E. Technology Strategy Development
F. Account Qualification and Planning
G. Business Case Development
H. Proof of Concept
Answer : C (Reference : [websitebanned], examworx)
Question #15
Which definition best describes the staging plan development service component within the design phase? Select exactly 1 answer(s) from the following:
A. providing a step-by-step plan that details the installation and service-commission tasks required in order to create a controlled-implementation environment that emulates a customer network
B. assessing the ability of site facilities to accommodate proposed infrastructure changes
C. developing and executing proof-of-concept tests, validating high-level infrastructure design, and identifying any design enhancements
D. improving the network management system and the performance and functionality of infrastructure operations
Answer : A (Reference : Actualests, [websitebanned], examworx)
Question #16
Which of these phases involves ensuring that a new solution has been integrated without disrupting the existing network? Select exactly 1 answer(s) from the following:
A. plan
B. prepare
C. operate
D. implement
Answer : D (Reference : pass4sure, [websitebanned], examworx)
Question #17
Which implement phase service component consists of explaining the benefits and limitations of purchased support options to a customer and ensuring that the customer understands operational processes and responsibilities?
Select exactly 1 answer(s) from the following:
A. Staging and System Migration
B. Post Implementation Support Handoff Meeting
C. Detailed Design Development
D. Staff Training
Answer : A (Reference : [websitebanned], examworx)
Question #18
Which of the following best describe the customer benefits of change management in the operate phase? Select exactly 1 answer(s) from the following:
A. reduce unnecessary disruption, delays, rework, and other problems by establishing test cases for use in verifying that the system meets operational, functional, and interface requirements
B. improve its ability to make sound financial decisions by developing a business case based on its business requirements and establishing a basis for developing a technology strategy
C. reduce operating costs and limit change-related incidents by providing a consistent and efficient set of processes
D. improve the return on investment and hasten migration by identifying and planning for necessary infrastructure changes and resource additions, as well as reduce deployment costs by analyzing gaps early in the planning process to determine what is needed to support the system
Answer : C (Reference : [websitebanned])
Question #19
Which three business requirements development activities are performed in the prepare phase before creating a technology strategy? (Choose three.)
Select exactly 3 answer(s) from the following:
A. identifying and assessing customer business requirements
B. documenting and categorizing customer business requirements in terms of performance. availability, capacity, and security
C. producing a documented technology strategy
D. creating a bill of materials
E. presenting documented business requirements to a customer and having the customer validate them
F. completing a site survey
Answer : A, B, E (Reference : pass4sure, [websitebanned])
Question #20
Which three of these service components are in the implement phase? (Choose three.)
Select exactly 3 answer(s) from the following:
A. Staging
B. Business Requirements Development
C. Post Implementation Support Handoff Meeting
D. Detailed Design Development
E. Staff Training
F. Incident Management
Answer : A, D, E (Reference : examworx, [websitebanned])
Question #21
During the implement phase, systems acceptance testing does which of the following for the customer? Select exactly 1 answer(s) from the following:
A. installation, configuration, and testing, as well as the commissioning of tools and processes in accordance with the operations implementation plan
B. provision of information regarding customer-specified design requirements and configuration
C. the migration of network services from an existing state to a future state in accordance with the migration plan
D. the provision of an objective means of measuring system operability and functionality
Answer : D (Reference : examworx)
Question #22
Which benefit can be obtained by using the configuration management service component in the operate phase? Select exactly 1 answer(s) from the following:
A. reduced operating costs, due to a consistent framework for making necessary changes in an efficient and accountable manner
B. greater accuracy, completeness, and timeliness of network configuration information
C. notification provided to interested parties regarding problems that have been identified, and a system that scales with customer requirements
D. improved system service quality and fewer disruptions
Answer : A (Reference : pass4sure, examworx)
Question #23
Which design phase service component consists of developing a detailed, site-specific plan for implementing a new technology system or solution? Select exactly 1 answer(s) from the following:
A. Detailed Design Development
B. Systems Acceptance Test Plan Development
C. Staging Plan
D. Implementation Plan Development
E. Project Kick-off
Answer : D (Reference : pass4sure)
Question #24
Which three best describe the customer benefits of the Cisco Lifecycle Services approach? (Choose three.) Select exactly 3 answer(s) from the following:
A. improve the skill sets of its staff members
B. increase the value of and return on investment for its networks
C. increase network staff productivity
D. increase the amount of server room rack space
E. improve network availability, resiliency, security, and scalability
F. increase the amount of time required to integrate network changes
Answer : B, E, F (Reference : examworx)
Question #25
Which of these is the best definition of the Cisco Lifecycle Services approach?
Select exactly 1 answer(s) from the following:
A. It defines the minimum set of services required to successfully deploy and operate a set of Cisco technologies.
B. It determines how best to price Cisco products.
C. It provides partners with a useful way to leverage Cisco resources.
D. It consists of these phases: plan, deploy, support, and troubleshoot.
Answer : A (Reference : Actualests, examworx)
Question #26
In which of these phases is a set of acceptance tests developed and documented?
A. implement
B. design
C. prepare
D. operate
Answer : C (Reference : examworx)
Question #27
Which is the most accurate statement regarding the business requirements development service component in the prepare phase. Select exactly 1 answer(s) from the following:
A. Determine the appropriate cooling temperature for a customers server room.
B. Analyze the customers business requirements for a proposed solution.
C. Analyze a customers ongoing operational requirements.
D. Identify a customers technology requirements.
Answer : B (Reference : examworx)
Question #28
Which of these is an accurate list of Cisco Lifecycle Services phases?
Select exactly 1 answer(s) from the following:
A. initiation planning analysis design development implementation operations and maintenance
B. project planning, site assessment risk assessment solution selection and acquisition, testing, and operations
C. prepare, plan, design, implement operate, and optimize
D. analysis, design, deployment testing, implementation, and production
E. presales, project planning, development implementation, operations
testing, and operations sign- off
Answer : C (Reference : Actualests)
Question #29
Which two service components are in the plan phase? (Choose two)
A. Proof of Concept
B. Site Readiness Assessment
C. Proposal Development
D. Operations Readiness Assessment
E. Account planning
Answer : B, D (Reference : Actualests)
Question #30
Which design phase service component includes the development and documentation of the test case or cases used to verify that a deployed infrastructure meets operational, functional, and interface requirements? Select exactly 1 answer(s) from the following:
A. Implementation Plan
B. Business Plan
C. Staging Plan
D. Detailed Design Development
E. Systems Acceptance Test Plan Development
Answer : E (Reference : Actualests, examworx)
Question #31
In which of these phases is a customers current network infrastructure assessed?
A. plan
B. design
C. implement
D. prepare
Answer : A
Question #32
Choose the most accurate statement regarding the account qualification and planning service component in the prepare phase. Select exactly 1 answer(s) from the following:
A. providing a partner with information regarding customer acceptance of a new Solution
B. providing information regarding current network infrastructure readiness
C. using stakeholder interviews to identify stakeholders and decision-makers, high-level solution requirements, timelines, and the scope of an opportunity
D. adjusting a solution to account for a customers physical site characteristics
Answer : C (Reference : pass4sure, examworx)
Question #33
Which three service components are in the operate phase? (Choose three.)
Select exactly 3 answer(s) from the following:
A. System Monitoring
B. Operations Implementation
C. Incident and Problem Management
D. Change Management
E. Operations Plan
F. Project Close Out
Answer : A, C, D (Reference : pass4sure, examworx)
Question #34
Which definition best describes the implementation service component within the implement phase? Select exactly 1 answer(s) from the following:
A. providing a step-by-step plan that details the installation and service-commission tasks required in order to create a controlled-implementation environment that emulates a customer network
B. assessing the ability of site facilities to accommodate proposed infrastructure changes
C. developing and executing proof-of-concept tests, validating high-level infrastructure design, and identifying any design enhancements
D. installing, configuring, and integrating systems components based on an implementation plan developed in earlier phases
E. improving a customer’s infrastructure security system
Answer : D (Reference : examworx)
Question #35
Which service component within the prepare phase recommends the appropriate technology strategy to address a business requirement of the customer? Select exactly 1 answer(s) from the following:
A. identifying what a customer requires from a proposed solution
B. analyzes the customers business requirements and recommends the appropriate Cisco technologies to meet business requirements
C. determining what end-user training a customer requires
D. addressing a customer’s physical requirements
Answer :B (Reference : examworx)
Question #36 (e)
Which three best describe the partner benefits of the Cisco Lifecycle Services approach? (Choose three.) Select exactly 3 answer(s) from the following:
A. improve customer satisfaction rates
B. improve the skill sets of their staff members
C. increase their staff productivity
D. reduce the risk involved with deploying and supporting new and complex technologies
E. improve response times for network outages
F. help ensure that suppliers are meeting metrics
Answer : A, C, D
Question #37
In which of these phases is a detailed design of a proposed customer solution developed?
A. plan
B. design
C. prepare
D. operate
Answer : C (Reference : examworx)
Question #38
Which of these is a phase of Cisco Lifecycle Service?
A. site readiness assessment
B. business requirements development
C. deign
D. site survey
E. customer education
Answer : B (Reference : examworx)
Question #39
Which plan phase service component involves evaluating how prepared a customers current facility infrastructure is to support a new technology? Select exactly 1 answer(s) from the following:
A. Proof of Concept
B. Site Readiness Assessment
C. Proposal Development
D. Operations Readiness Assessment
Answer : B (Reference : Pass4sure)
Question #40
In the plan phase, network readiness assessment addresses which customer need?
Select exactly 1 answer(s) from the following:
A. an assessment of the preparedness of the customers existing system infrastructure to support a propose solution
B. a comprehensive design that has been customized based on the operations processes, network management processes, and tools of its system
C. an in-depth assessment of the operational environment required to support the operation of both the current and planned solutions
D. the optimal technologies for supporting its business requirements and objectives
Answer : A (Reference : Actualests, examworx)
Question # 41
Which best describes the customer benefit of creating a system acceptance test plan in the design phase? Select exactly 1 answer(s) from the following:
A. reduce unnecessary disruption, delays, rework, and other problems by establishing test cases for use in verifying that the system meets operational, functional, and interface requirements
B. improve its ability to make sound financial decisions by developing a business case based on its business requirements and establishing a basis for developing a technology strategy
C. reduce operating costs and limit change-related incidents by providing a consistent and efficient set of processes
D. improve the return on investment and hasten migration by identifying and planning for necessary infrastructure changes and resource additions, as well as reduce deployment costs by analyzing gaps early in the planning process to determine what is needed to support the system
Free PassGuide Practice Engine Demo Download
Pass4sure offers free demos for each certification exam, including all IT vendors. You can check out the testing engine software, or pdf file question quality and usability of our practice exams before you decide to buy it. We are the only one site that offers demos for almost all IT certification exams.If you want to try p4s exam practice engine demo.
http://demo.passguide.com/download
Answer : C
Question # 42
Which prepare phase service component involves testing high-level in a controlled environment to ensure that it meets business and technology requirements?
Select exactly 1 answer(s) from the following:
A. Technology Strategy Development
B. High-Level Design Development
C. Business Case Development
D. Proof of Concept
Answer : B
Question # 43
Which of the following best describe the customer benefit of creating a system acceptance test plan in the design phase? Select exactly 1 answer(s) from the following:
A. reduce unnecessary disruption, delays, rework, and other problems by establishing test cases for use in verifying that the system meets operational, functional, and interface requirements
B. improve its ability to make sound financial decisions by developing a business case based on its business requirements and establishing a basis for developing a technology strategy
C. reduce operating costs and limit change-related incidents by providing a consistent and efficient set of processes
D. improve the return on investment and hasten migration by identifying and planning for necessary infrastructure changes and resource additions, as well as reduce deployment costs by analyzing gaps early in the planning process to determine what is needed to support the system
Answer : C
I JUST ?2008-4-17 10?00?PASSED THE EXAME,WITH SCORE 900 ?
1? In which of these phases is a customers current network infrastructure assessed?
A. plan
B. design
C. implement
D. prepare
Answer : A
2? Which definition best describes the staging plan development service component within the design phase? Select exactly 1 answer(s) from the following:
A. providing a step-by-step plan that details the installation and service-commission tasks required in order to create a controlled-implementation environment that emulates a customer network
B. assessing the ability of site facilities to accommodate proposed infrastructure changes
C. developing and executing proof-of-concept tests, validating high-level infrastructure design, and identifying any design enhancements
D. improving the network management system and the performance and functionality of infrastructure operations
Answer : A
3? Which implement phase service component consists of explaining the benefits and limitations of purchased support options to a customer and ensuring that the customer understands operational processes and responsibilities?
Select exactly 1 answer(s) from the following:
A. Staging and System Migration
B. Post Implementation Support Handoff Meeting
C. Detailed Design Development
D. Staff Training
Answer : B
4? What is one key objective of the operations readiness assessment performed in the plan phase? Select exactly 1 answer(s) from the following:
E. align business requirements with technical requirements
F. create a plan to recycle used equipment
G. evaluate the readiness of a customers current operations and network management infrastructure to support a new technology
H. install and test system components in a non-production environment
Answer : C
5? In which of these phases is a detailed design of a proposed customer solution developed?
A. plan
B. design
C. prepare
D. operate
Answer :B
6? Which of these is a phase of Cisco Lifecycle Service?
A. site readiness assessment
B. business requirements development
C. deign
D. site survey
E. customer education
Answer : C
7? Which prepare phase service component involves recommending an appropriate technology that will address a customers business requirements? Select exactly 1 answer(s) from the following:
a. Technology Strategy Development
b Account Qualification and Planning
c. Business Case Development
d. Proof of Concept
Answer : A
8? Which benefit can be obtained by using the configuration management service component in the operate phase? Select exactly 1 answer(s) from the following:
A. reduced operating costs, due to a consistent framework for making necessary changes in an efficient and accountable manner
B. greater accuracy, completeness, and timeliness of network configuration information
C. notification provided to interested parties regarding problems that have been identified, and a system that scales with customer requirements
D. improved system service quality and fewer disruptions
Answer : A
9? Which three best describe the partner benefits of the Cisco Lifecycle Services approach? (Choose three.) Select exactly 3 answer(s) from the following:
A. improve customer satisfaction rates
B. improve the skill sets of their staff members
C. increase their staff productivity
D. reduce the risk involved with deploying and supporting new and complex technologies
E. improve response times for network outages
F. help ensure that suppliers are meeting metrics
Answer : A, C, D
10? Which definition best describes the implementation service component within the implement phase? Select exactly 1 answer(s) from the following:
A. providing a step-by-step plan that details the installation and service-commission tasks required in order to create a controlled-implementation environment that emulates a customer network
B. assessing the ability of site facilities to accommodate proposed infrastructure changes
C. developing and executing proof-of-concept tests, validating high-level infrastructure design, and identifying any design enhancements
D. installing, configuring, and integrating systems components based on an implementation plan developed in earlier phases
E. improving a customer’s infrastructure security system
Answer : D
11? Which prepare phase service component involves providing a customer with a financial justification for adopting a technology? Select exactly 1 answer(s) from the following:
A. Technology Strategy Development
B. High-Level Design Development
C. Business Case Development
D. Proof of Concept
Answer : C
12? Which definition best describes the staff training service component within the implement phase? Select exactly 1 answer(s) from the following:
A. improving the network management system and the performance and functionality of infrastructure operations
B. providing a step-by-step plan that details the installation and service-commission tasks required in order to create a controlled-implementation environment that emulates a customer network
C. developing and implementing a training plan using classes, workshops, or c-learning courses
D. compiling a training manual for use in ongoing operations
E. reducing the risk of downtime due to facilities-related problems
Answer : C
?
13? Which implement phase service component consists of preparing for migration,excuting a network migration plan,and completing migration test cases?
A staging and system migration
B post implementation support handoff meeting
C detailed design development
D staff training
E migration plan development
Answer: e
14? In which of these phases are a customers technology strategy requirements identified and documented? Select exactly 1 answer(s) from the following:
A. Plan
B. design
C. prepare
D. operate
Answer : C
15? Which is the most accurate statement regarding the business requirements development service component in the prepare phase. Select exactly 1 answer(s) from the following:
A. Determine the appropriate cooling temperature for a customers server room.
B. Analyze the customers business requirements for a proposed solution.
C. Analyze a customers ongoing operational requirements.
D. Identify a customers technology requirements.
Answer : B
16? In the design phase, which service component provides the customer with a comprehensive design? Select exactly 1 answer(s) from the following:
A. Implementation Plan
B. Detailed Design Development
C. Project Kick-off
D. Staging Plan
E. High-Level Design
Answer : B
17? Which of these phase comprises post-project support activities: activities that happen after a project is successfully implemented and handed off? Select exactly 1 answer(s) from the following:
A. plan
B. prepare
C. operate
D. implement
Answer : A
18? Which design phase service component includes the development and documentation of the test case or cases used to verify that a deployed infrastructure meets operational, functional, and interface requirements? Select exactly 1 answer(s) from the following:
A. Implementation Plan
B. Business Plan
C. Staging Plan
D. Detailed Design Development
E. Systems Acceptance Test Plan Development
Answer : E
19? Which three best describe the partner benefits of the Cisco Lifecycle Services approach? (Choose three.) Select exactly 3 answer(s) from the following:
A. improve customer satisfaction rates
B. improve the skill sets of their staff members
C. increase their staff productivity
D. reduce the risk involved with deploying and supporting new and complex technologies
E. improve response times for network outages
F. help ensure that suppliers are meeting metrics
Answer : A, C, D
20? Which two service components are in the plan phase? (Choose two)
A. Proof of Concept
B. Site Readiness Assessment
C. Proposal Development
D. Operations Readiness Assessment
E. Account planning
Answer : B, D
21? In the plan phase, network readiness assessment addresses which customer need?
Select exactly 1 answer(s) from the following:
A. an assessment of the preparedness of the customers existing system infrastructure to support a propose solution
B. a comprehensive design that has been customized based on the operations processes, network management processes, and tools of its system
C. an in-depth assessment of the operational environment required to support the operation of both the current and planned solutions
D. the optimal technologies for supporting its business requirements and objectives
Answer : A
22? Which of these phases involves ensuring that a new solution has been integrated without disrupting the existing network? Select exactly 1 answer(s) from the following:
A. plan
B. prepare
C. operate
D. implement
Answer : D
23? Which three service components are in the operate phase? (Choose three.)
Select exactly 3 answer(s) from the following:
A. System Monitoring
B. Operations Implementation
C. Incident and Problem Management
D. Change Management
E. Operations Plan
F. Project Close Out
Answer : A, C, D
24? Which three of these service components are in the implement phase? (Choose three.)
Select exactly 3 answer(s) from the following:
A. Staging
B. Business Requirements Development
C. Post Implementation Support Handoff Meeting
D. Detailed Design Development
E. Staff Training
F. Incident Management
Answer : A, C E
25? Which of the following best describe the customer benefit of assessing for network readiness in the plan phase? Select exactly 1 answer(s) from the following:
A. reduce unnecessary disruption, delays, rework, and other problems by establishing test cases for use in verifying that the system meets operational, functional, and interface requirements
B. improve its ability to make sound financial decisions by developing a business case based on its business requirements and establishing a basis for developing a technology strategy
C. reduce operating costs and limit change-related incidents by providing a consistent and efficient set of processes
D. improve the return on investment and hasten migration by identifying and planning for necessary infrastructure changes and resource additions, as well as reduce deployment costs by analyzing gaps early in the planning process to determine what is needed to support the system
Answer : D
26? Which of the following best describe the customer benefits of change management in the operate phase? Select exactly 1 answer(s) from the following:
A. reduce unnecessary disruption, delays, rework, and other problems by establishing test cases for use in verifying that the system meets operational, functional, and interface requirements
B. improve its ability to make sound financial decisions by developing a business case based on its business requirements and establishing a basis for developing a technology strategy
C. reduce operating costs and limit change-related incidents by providing a consistent and efficient set of processes
D. improve the return on investment and hasten migration by identifying and planning for necessary infrastructure changes and resource additions, as well as reduce deployment costs by analyzing gaps early in the planning process to determine what is needed to support the system
Answer : C
27? Which benefit can be obtained by using the CHANGE management service component in the operate phase? Select exactly 1 answer(s) from the following:
A. reduced operating costs, due to a consistent framework for making necessary changes in an efficient and accountable manner
B. greater accuracy, completeness, and timeliness of network configuration information
C. notification provided to interested parties regarding problems that have been identified, and a system that scales with customer requirements
D. improved system service quality and fewer disruptions
Answer : A
28? Which of these is an accurate list of Cisco Lifecycle Services phases?
Select exactly 1 answer(s) from the following:
A. initiation planning analysis design development implementation operations and maintenance
B. project planning, site assessment risk assessment solution selection and acquisition, testing, and operations
C. prepare, plan, design, implement operate, and optimize
D. analysis, design, deployment testing, implementation, and production
E. presales, project planning, development implementation, operations
testing, and operations sign- off
Answer : C
29? During the implement phase, systems acceptance testing does which of the following for the customer? Select exactly 1 answer(s) from the following:
A. installation, configuration, and testing, as well as the commissioning of tools and processes in accordance with the operations implementation plan
B. provision of information regarding customer-specified design requirements and configuration
C. the migration of network services from an existing state to a future state in accordance with the migration plan
D. the provision of an objective means of measuring system operability and functionality
Answer : D
30? Which prepare phase service component involves testing high-level in a controlled environment to ensure that it meets business and technology requirements?
Select exactly 1 answer(s) from the following:
A. Technology Strategy Development
B. High-Level Design Development
C. Business Case Development
D. Proof of Concept
Answer : B
31? Which three business requirements development activities are performed in the prepare phase before creating a technology strategy? (Choose three.)
Select exactly 3 answer(s) from the following:
A. identifying and assessing customer business requirements
B. documenting and categorizing customer business requirements in terms of performance. availability, capacity, and security
C. producing a documented technology strategy
D. creating a bill of materials
E. presenting documented business requirements to a customer and having the customer validate them
F. completing a site survey
Answer : A, B, E
32? In which of these phases is a customers network assessed to determine its system readiness? Select exactly 1 answer(s) from the following:
A. plan
B. design
C. operate
D. implement
Answer : A
33? Conducting a project kick-off in the plan phase provides which of the following customer benefits? Select exactly 1 answer(s) from the following:
A. ensure that it receives detailed network diagrams
B. reduce the risk of downtime due to facilities-related problems
C. ensure end-user support immediately after the launch of a new system
D. confirm project roles and responsibilities, as well as milestone dates
Answer : D
34? In which of these phases is a set of acceptance tests developed and documented?
A. implement
B. design
C. prepare
D. operate
Answer : B
35? Which of these is the best definition of the Cisco Lifecycle Services approach?
Select exactly 1 answer(s) from the following:
A. It defines the minimum set of services required to successfully deploy and operate a set of Cisco technologies.
B. It determines how best to price Cisco products.
C. It provides partners with a useful way to leverage Cisco resources.
D. It consists of these phases: plan, deploy, support, and troubleshoot.
Answer : A
36? Which plan phase service component involves evaluating how prepared a customers current facility infrastructure is to support a new technology? Select exactly 1 answer(s) from the following:
A. Proof of Concept
B. Site Readiness Assessment
C. Proposal Development
D. Operations Readiness Assessment
Answer : B
37? Which three of these service components are in the design phase? (Choose three.)
Select exactly 3 answer(s) from the following:
A. Account Qualification and Planning
B. Detailed Design Development
C. Staff Training
D. Systems Acceptance Test Plan Development
E. Staging Plan Development
F. Site Readiness Assessment
Answer : BDE
38? Which design phase service component consists of developing a detailed, site-specific plan for implementing a new technology system or solution? Select exactly 1 answer(s) from the following:
A. Detailed Design Development
B. Systems Acceptance Test Plan Development
C. Staging Plan
D. Implementation Plan Development
E. Project Kick-off
Answer : D
39? Which best describes the customer benefit of developing business requirements in the prepare phase?
A. reduce unnecessary disruption, delays, rework, and other problems by establishing test cases for use in verifying that the system meets operational, functional, and interface requirements
B. improve its ability to make sound financial decisions by developing a business case based on its business requirements and establishing a basis for developing a technology strategy
C. reduce operating costs and limit change-related incidents by providing a consistent and efficient set of processes
D. improve the return on investment and hasten migration by identifying and planning for necessary infrastructure changes and resource additions, as well as reduce deployment costs by analyzing gaps early in the planning process to determine what is needed to support the system
Answer : B
40? Choose the most accurate statement regarding the account qualification and planning service component in the prepare phase. Select exactly 1 answer(s) from the following:
A. providing a partner with information regarding customer acceptance of a new Solution
B. providing information regarding current network infrastructure readiness
C. using stakeholder interviews to identify stakeholders and decision-makers, high-level solution requirements, timelines, and the scope of an opportunity
D. adjusting a solution to account for a customers physical site characteristics
Answer : C
Cisco Lifecycle Services Express
Exam Number: 650-393
Duration: 45 minutes (35 – 45 Questions)
Available Languages: English
Click Here to Register: Pearson VUE
Exam Policies: Read current policies and requirements
Exam Tutorial: Review type of exam questions
Exam Description Exam Topics
Exam Description
The 650-393 LCSE Cisco Lifecycle Services Express exam tests a candidate’s knowledge of the Cisco Lifecycle Services approach to help successfully sell, deploy, and support Cisco technologies. Candidates can prepare for this exam by taking the LCSE Cisco Lifecycle Services Express course.
Exam Topics
The following topics are general guidelines for the content likely to be included on the Remote Access exam. However, other related topics may also appear on any specific delivery of the exam. In order to better reflect the contents of the exam and for clarity purposes, the guidelines below may change at any time without notice.
Describe the Cisco Lifecycle Services approach
Describe the structure and organization of the Cisco Lifecycle Services approach
Describe the service components included in the Prepare phase of the Cisco Lifecycle Services approach
Describe the service components included in the Plan phase of the Cisco Lifecycle Services approach.
Describe the service components included in the Design phase of the Cisco Lifecycle Services approach.
Describe the service components included in the Implement phase of the Cisco Lifecycle Services approach.
Describe the service components included in the Operate phase of the Cisco Lifecycle Services approach.
Describe the value of the Cisco Lifecycle Services approach
Describe the value of the Cisco Lifecycle Services approach for the customer.
Describe the value of the Cisco Lifecycle Services Approach for the partner.
1. Which definition best describes the staff training service component within the implement phase?
Select exactly 1 answer(s) from the following:
A. improving the network management system and the performance and functionality of infrastructure operations
B. providing a step-by-step plan that details the installation and service-commission tasks required in order to
create a controlled-implementation environment that emulates a customer network
C. developing and implementing a training plan using classes, workshops, or c-learning courses
D. compiling a training manual for use in ongoing operations
E. reducing the risk of downtime due to facilities-related problems
Answer: A
2. In which of these phases are a customers technology strategy requirements identified and documented?
Select exactly 1 answer(s) from the following:
A. Plan
B. design
C. prepare
D. operate
Answer: C
3. What is the key objective of the plan phase?
A. identify the activites involoved in insttalling and configuring equipment at a customer’s site or sites.
B. describe the day-to-day activities required to support, manage, and monitor a newly implemented system.
C. assess current network readiness, site readiness, and operational readiness in preparation for designing a
solution proposal.
D. gain an understanding of high-level business and technical requirements.
Answer: A
4. In which of these phases is a customers network assessed to determine its system readiness?
Select exactly 1 answer(s) from the following
A. plan
B. design
C. operate
D. implement
Answer: A
5. In the design phase, which service component provides the customer with a comprehensive design?
Select exactly 1 answer(s) from the following:
A. Implementation Plan
B. Detailed Design Development
C. Project Kick-off
D. Staging Plan
E. High-Level Design
Answer: B
Free download:pass4sure 650-393
Free download:testking 650-393
more info:www.ciscoexams.org
| P4S Free Downloads |
|
Type |
Exam Braindumps | New Questions & Answers |
Latest Updated |
Available link |
![]() |
All Pass4sure's Exam Pack |
858 |
1 days ago | Download Free Testing Engines |
PassGuide Braindumps-Free Test king Help You Quick Pass Any it Certifications Exams
Click links: www.testking.la/braindumps/free/down/crack/all/testkingPass Guide Training Materials Dumps
Top Posts for Today
- f5 (43 views)
- free pass4sure ccna 640-802 v3.10 (24 views)
- free pass4sure COGNOS Certification exam dumps (17 views)
- IT Certification Forum (11 views)
- pass4sure ccna 640-802 473 Q&As (7 views)
- Pass4sure Business Objects SABE301 2.83 (7 views)
- Pass4sure OG0-091 (7 views)
- Pass4sure EXIN,Inc ex0-101 2.93 (7 views)
- Pass4sure EX0-104 (6 views)
- pass4sure oracle 1Z0-007 2.95 (5 views)










Comment by pass4sure
thanks
Comment by zool
thanks a lot
Comment by ahmed
i cant download the 650-393 ..please help
emial: ahmedkhattab21@yahoo.com
Comment by Ram
Hi frenz
where to download the file (650-393).I f some one got(650-393) plz mail to
ramshree_sv@yahoo.co.in.
Thank you
Comment by Marcio
Hi, friends.
Does somebody have the test 650-393 lcse of Cisco ?
If you have, can you send in logmos21@yahoo.com.br , plz ?
Thank you.
Comment by david
If anybody have 650-393 pls send me. bombshop1@yahoo.com
Thank you
Comment by Mr. Yoo
I want download the 650-393 …..
please help
Thanks
Comment by Mr. Yoo
I want download the 650-393 …..
please help
Thanks
Comment by Mr. Yoo
I want download the 650-393 …..
please help
75chang9@naver.com
Comment by Bassem
Hi All,
Regarding “PLS wait” message, I’m waiting since 5 days !!!
Can anyone having the 650-393 file upload it somewhere and then write the address for this file, so anyone can get it ?
Thanks in advance
Regards,
Comment by pass4sure
down it:
http://www.Certbible.net/exam/p4s/cisco/other/Cisco_Lifecycle_Services_Express_-_650_393_-_ENU.rar
Comment by agness
please can someone send me CLSE 650-393 tutorials.Am preparing for this exam but dont know where to get the tutorials.
thanks.
Comment by David
Here is testking v.2.0
hxxp://rapidshare.com/files/114676054/650-393.rar.html
Comment by sj
I failed LCSE exam twice. then refer to this page.
answer is wrong.
Comment by agness
please help me if you have done this life cycle exam in the past one month by telling me the kind of questions that were included there. plz coz am planning to do this exam 2moro